Wangrui, general manager of Xianchu Nuclear Power Technology Co., Ltd., personally led the team to join the acceptance check work of the replacement of overflow valve for water tank cover equipment out of the box in the MY78 safety house in Haiyang nuclear power plant
Time:2016-03-24Author: